Scenario setup
7 floors, 3 elevators
Customize building size
Changing building size clears the run and measurements.
Simulation Control
Speed Control
Status
Stop keeps the run. Reset clears trips and measurements.
Building Visualization
Whole-building overview
All cars and waiting floors. Full-size details remain below.
- E1 Floor 1.0, idle 0/8 passengers
- E2 Floor 1.0, idle 0/8 passengers
- E3 Floor 1.0, idle 0/8 passengers
No passengers waiting.
Scroll sideways for elevator and floor details, and vertically for all floors. You can also focus the building and use the arrow keys.
Routing strategy
FIFO means First In, First Out. This demo prefers idle cars, then the lowest passenger load; it does not enforce a strict request queue.
These are simplified dispatch rules. Reset before comparing strategies.
Real-time Metrics
0 completed trips. Wait is measured from arrival to boarding. Throughput counts completed trips per simulation minute since the last reset or building change. Wait becomes available after boarding; throughput after a completed trip.